skip to Main Content

Agitator for sludge buffer tank

Case studies

Agitator for sludge buffer tank

For the biological expansion of the sewage treatment works (STW) in Kampen, the Drents Overijsselse Delta Water Board has awarded the contract for the design and construction of, amongst other things, the sludge buffer tank to the engineering firm Water Techniek Twente. Veenstra Technology was commissioned to carry out the technical development and construction of the agitator for the sludge buffer tank. Veenstra was responsible for the complete design, production and on-site installation work.

Read more

Background
Sludge is produced during the treatment of wastewater. Previously, this sludge was digested at the Kampen sewage treatment works. For reasons of efficiency, sludge digestion no longer takes place in Kampen. From 2018, this sludge will be temporarily stored in the new sludge buffer tank and then processed at the water treatment plant in Zwolle. In Kampen, the thickened sludge in the buffer tank – which has a diameter of 10 metres and a height of 8 metres – is kept homogeneous by the Veenstra Technology Top-Entry agitator.

Liver size
The Top-Entry agitator supplied comprises a 15 kW motor with a gearbox, a double-bearing housing, a coupled agitator shaft, a bottom bearing and a two-bladed, inclined-blade agitator body with a diameter of no less than 2.9 metres.